Features Guides Insights Free tools For Carriers For Brokers For Drivers For Safety Providers Pricing Log In Sign up See plans
  1. Home
  2. Insights
  3. Street turns

Street turns: reusing an import empty for an export load

Drayage and intermodal · Updated · TruckerPro editorial team

A street turn is when an empty container from an import delivery is loaded for an export customer instead of going back to the port or rail terminal first. It saves an empty trip to the terminal, a gate transaction and an empty pickup on the export side. It is only allowed when the container's provider (usually the ocean carrier) approves it, the box suits the export load, and the interchange is recorded so that per diem and liability move from the import move to the export move. Until that happens, the motor carrier that took the box out of the terminal is still responsible for it.

Key points

What a street turn is

An import container normally makes two trips with your truck. You pull it loaded from the terminal, deliver it to the consignee, wait for it to be unloaded, then haul the empty back to the terminal or to a depot the provider names. Somewhere else in the same metro area, an exporter needs an empty container of the same kind, so another truck goes to the terminal, pulls an empty and takes it to the shipper to be loaded.

A street turn joins those two moves. The empty from the import is taken directly to the export shipper, loaded, and delivered to the terminal for the outbound vessel. The container never makes the empty trip back. The term comes from the box being turned "on the street" rather than at the terminal. The same idea applies to a chassis: if the chassis stays under the container, the chassis is turned as well.

Two business terms sit behind every street turn. The first is interchange: the handover of physical possession of equipment between the provider and a motor carrier. The federal definition (49 CFR 390.5T) describes interchange as providing intermodal equipment to a motor carrier under a written interchange agreement for loading, unloading or repositioning. The second is the interchange agreement itself. For most North American intermodal equipment that is the Uniform Intermodal Interchange and Facilities Access Agreement (UIIA), which the federal definition names, plus each equipment provider's own addendum.

Why carriers and shippers want them

The savings are in moves that never happen:

Without a street turnWith a street turn
Import empty hauled back to the terminal or depotImport empty goes straight to the export shipper
Separate trip to pull an export emptyNo export empty pickup
Two terminal gate transactions, often two appointmentsNo terminal visit until the loaded export goes in
Two sets of empty miles in congested port trafficOne set of loaded miles from importer to exporter

For a drayage carrier that means more loaded moves per truck per day and fewer hours sitting in terminal queues. On the import side it can stop the per diem clock earlier, because the box leaves the import interchange as soon as the turn is accepted, which matters to whoever ends up paying that per diem. For the export customer it removes the risk of finding no empties at the terminal on the day they need one. Ports and terminals benefit from fewer empty gate transactions. This is why many providers allow street turns, even though each one asks them to give up a little control over where their equipment goes.

What has to line up

A street turn is a match between two bookings. Before you dispatch one, check each of these. If any is missing, return the empty the normal way.

What the interchange agreement says

The UIIA does not use the phrase "street turn" in its main terms, but several of its definitions decide how one works. These references are to the version effective June 18, 2026, published by the Intermodal Association of North America (IANA):

The commercial details belong to each provider's addendum. The UIIA's addenda template lists "Street Turn" among the administrative fees a provider may include (template section III.E), along with free time rules, per diem schedules and the provider's dispute process. So two lines at the same port can have quite different street-turn rules, and the place to read them is the addendum, not the master agreement.

IANA also runs a Street Interchange Application for UIIA participants. On its own description, the application records the transfer of liability, damage and indemnification from the originating motor carrier to the receiving one, stops the clock on the import move and starts it on the export move for street turns, and checks that the receiving motor carrier has a valid UIIA interchange with the providers involved. Whether you use it, or a provider's own portal, depends on the provider.

Risks: per diem, liability and paperwork

The point of a street turn is to save money and time. It goes wrong in predictable ways:

How to record a street turn

Treat the street turn as a move on the container, not as a note in a text thread. A clean record has:

  1. The import container number, the import bill of lading or reference, and the date the import delivery was completed.
  2. The export booking number the container is being turned onto, and the shipper's pickup location.
  3. The provider's approval reference, and the date and time it was given.
  4. The condition of the container and chassis at the point of the turn, with photos.
  5. Any street-turn fee and who pays it.
  6. The date the loaded export was gated into the terminal, which closes the container's interchange.

Keep that record with the load it belongs to, so that when a per diem invoice arrives months later, you can show when the turn was approved and when the export went in. The demurrage, detention and per diem guide covers how those container charges are counted, and the last free day article covers the deadlines on the import side.

A street turn saves the most when it is planned at the import delivery, not after the empty has already been sitting in the yard. Ask your export customers for their bookings early, and match them against imports you are delivering this week.

How TruckerPro records street turns

TruckerPro's Intermodal and Drayage workspace, on the Elite plan and up and switched on in company Settings, treats each container as a job. Street turn is one of the moves you can add to a container, alongside import pickup, customer delivery, empty return and export delivery, and a move can be linked to a dispatch leg. A street turn cannot be completed until the empty return location and reference are entered on the container, and like other pickup moves it is blocked until your team has recorded the release, terminal access and equipment checks as clear or not required. Every change is logged as an event on the container. TruckerPro does not connect to terminal or shipping-line systems: the approval itself comes from the provider, and your team records its reference.

Frequently asked questions

What is a street turn in trucking?

A street turn is when an empty import container is loaded for an export shipment instead of being returned to the port or rail terminal first. It saves the empty return trip and the export empty pickup.

Do I need permission for a street turn?

Yes. The equipment provider, usually the ocean carrier that controls the container, has to approve it. Its addendum to the interchange agreement sets the rules, and some providers charge a street-turn fee.

Who pays per diem on a street-turned container?

Until the provider accepts the street turn, per diem stays with the motor carrier that took the container on the import side. Once it is accepted, the import clock stops and the export clock starts, according to the provider's terms.

Can any empty container be street turned?

No. It must belong to the line on the export booking, match the booking's size and type, be in suitable condition for the export cargo, and be loaded within the time the provider allows.

What is the UIIA?

The Uniform Intermodal Interchange and Facilities Access Agreement, administered by the Intermodal Association of North America. It is the standard contract for interchanging intermodal equipment between motor carriers and equipment providers, with each provider adding its own addendum.

Sources

Regulations change. Check the current rule at the source before you act on it; this page is general information, not legal or tax advice.